201605

美国核电厂安全壳整体密封性试验
发布人:网站管理员 发布时间:2016/6/8 点击次数:126次
  

美国核电厂安全壳整体密封性试验
黄海涛,杨炯,马先宏
(国核电站运行服务技术有限公司,上海200233)
摘要: 介绍美国A核电厂十年大修中的整体密封性试验流程,包括其所采用的标准、测量系统及试验方案,并对试验
结果及方案的合理性进行了分析。
关键词: 安全壳;整体密封性试验;试验工艺
中图分类号: TL38 文献标识码: A 文章编号: 2095-0802-(2016)05-0085-03
Containment Integrated Leakage Rate Test of U.S. Nuclear Power Plant
HUANG Haitao, YANG Jiong, MA Xianhong
(State Nuclear Power Plant Service Company, Shanghai 200233, China)
Abstract: The paper described the process of integrated leakage rate test (ILRT) during the 10 year outage of U.S. A nuclear
power plant, including test criteria, test equipment and test project, and gave a brief analysis of test result and test process.

Key words: containment; ILRT; experiment technology