201909

综采工作面过断层施工工艺探究
发布人:网站管理员 发布时间:2019/9/23 点击次数:139次
  

综采工作面过断层施工工艺探究
朱强
(同煤集团大斗沟煤业有限公司,山西大同037003)
摘要: 结合具体工程实际,在对比分析跳采过断层和直接过断层2 种施工工艺优缺点的基础上,确定直接过断层为A
矿9102 回采面过断层施工工艺,并对其过断层施工方案和其他配套技术强化措施做出分析和总结,希望能够为其他矿井
相似工程的有效开展提供借鉴和帮助。
关键词: 煤矿;综采工作面;过断层;施工工艺
中图分类号: TD823.97 文献标识码: A 文章编号: 2095-0802-(2019)09-0091-02
Exploration on Construction Technology for Fully Mechanized Mining Face Crossing Faults
ZHU Qiang
(Dadougou Coal Industry Co., Ltd., Datong Coal Mine Group, Datong 037003, Shanxi, China)
Abstract: Combining with specific engineering practice, on the basis of comparative analysis of advantages and disadvantages of
two construction technologies, skip mining and direct crossing fault, this paper determined that direct crossing fault was the
construction technology of crossing fault in 9102 mining face of A Mine, and made analysis and summary on the construction
scheme of crossing fault and other supporting technical strengthening measures, hoping to provide reference and help for the
effective development of similar projects in other mines.

Key words: coal mine; fully mechanized coal mining face; crossing faults; construction technology