202009

大采高作业面超前支护分析
发布人:网站管理员 发布时间:2020/9/18 点击次数:74次
  

大采高作业面超前支护分析
孟吉峰
(山西西山晋兴能源有限责任公司斜沟煤矿,山西 兴县 033602)
摘要: 以大采高作业面超前支护为对象开展探究。结合具体工程实际,在介绍作业面巷道初始支护方案的基础上,
对作业面巷道超前支护方案开展设计分析,并在此基础上对所用支架移架作业和超前支护段巷道维护做出探究,希望能
够为其他矿井相似工程的开展提供借鉴和参考。
关键词: 矿井;大采高作业面;超前支护;支护方案
中图分类号: TD353     文献标志码: A     文章编号: 2095-0802-(2020)09-0044-02
Analysis of Advanced Support in Working Face with Large Mining Height
MENG Jifeng
(Xiegou Coal Mine, Xishan Jinxing Energy Co., Ltd. of Shanxi, Xingxian 033602, Shanxi, China)
Abstract: This paper explored the advanced support in the working face with large mining height. Combined with the specific
engineering practice, on the basis of introducing the initial support scheme of the working face roadway, it carried out design
analysis on the advanced support scheme of the working face roadway, and on this basis, it explored the support moving operation
and the roadway maintenance of the advanced support section, hoping to provide reference for the development of similar projects
in other mines.

Key words: mine; working face with large mining height; advanced support; support scheme