202011

阳煤一矿综放工作面供电系统优化设计
发布人:网站管理员 发布时间:2020/11/23 点击次数:75次
  

阳煤一矿综放工作面供电系统优化设计
梁剑超
(阳泉煤业(集团)有限责任公司一矿,山西 阳泉 045008)
摘要: 对阳煤一矿综放工作面供电系统优化设计进行了讨论。为了保证阳煤一矿S8303 东工作面用电设备的安全可
靠运行,结合综放工作面具体情况,对综放工作面供电系统进行优化,改变传统的设备列车供电方式,在运输大巷建立
临时配电点,再向综放工作面供电,从而实现远距离供电;同时对3 300 V电缆进行选择校验。现场运行稳定可靠,保
证了工作面用电需求。
关键词: 供电系统;配电点;电缆;校验
中图分类号: TD611     文献标志码: A     文章编号: 2095-0802-(2020)11-0042-02
Optimization Design of Power Supply System for Fully Mechanized Caving Face in No.1 Coal
Mine of Yangquan Coal Industry Group
LIANG Jianchao
(No.1 Coal Mine, Yangquan Coal Industry (Group) Co., Ltd., Yangquan 045008, Shanxi, China)
Abstract: This paper discussed the optimization design of power supply system for fully mechanized caving face in No.1 Coal
Mine of Yangquan Coal Industry Group. In order to ensure the safe and reliable operation of electrical equipment in S8303 east
working face of No.1 Coal Mine of Yangquan Coal Industry Group, combining with the specific situation of fully mechanized
caving face, it optimized the power supply system of fully mechanized caving face, changed the traditional power supply mode of
equipment train, established temporary power distribution point in the transportation roadway, and then supplied power to the fully
mechanized caving face, so as to realize long-distance power supply; at the same time, it selected and verified the 3 300 V cable.
The field operation is stable and reliable, which ensures the power demand of working face.

Key words: power supply system; power distribution point; cable; verify