大采高综采面小煤柱留设及巷道支护设计方案研究
发布人:网站管理员 发布时间:2021/4/2 点击次数:137次
  

大采高综采面小煤柱留设及巷道支护设计方案研究
封文茂
(晋能控股集团晋城煤炭事业部晋煤太钢有限责任公司,山西 吕梁 033200)
摘要: 针对大采高综采面围岩控制困难,顶板变形量大,工作面帮内移动量大,给矿井综采效率和综采安全带来严
重不利影响的情况,对大采高综采面小煤柱留设及巷道支护设计方案进行了研究。实际分析表明,当大采高综采面小煤
柱留设宽度为6 m时围岩承载能力最强,变形量最小。通过对巷道支护方案的优化,能将巷道支护效率提升11.4%,将
巷道围岩变形量降低60%以上,综采效率提升了6.4%,显著提升了井下巷道的稳定性和支护效率。
关键词: 大采高;小煤柱留设;巷道支护
中图分类号: TD353     文献标识码: A     文章编号: 2095-0802-(2021)03-0059-02
Study on Design Scheme of Small Coal Pillar Setting and Roadway Support in Fully Mechanized
Mining Face with Large Mining Height
FENG Wenmao
(Jinmei Taigang Co., Ltd., Jincheng Coal Business Department, Jinneng Holding Group, Lvliang 033200, Shanxi, China)
Abstract: In view of the difficulty in controlling the surrounding rock, the large deformation of the roof and the large amount of
side movement within the working face in fully mechanized mining face with large mining height, which have serious adverse effects
on the efficiency and safety of the fully mechanized mining, this paper studied the design scheme of small coal pillar setting and
roadway support in fully mechanized mining face with large mining height. The actual analysis showed that the surrounding rock
bearing capacity was the strongest and the deformation was the smallest when the width of the small coal pillars in the fully
mechanized mining face with large mining height was 6 m. By optimizing the roadway support scheme, the roadway support efficiency
can be increased by 11.4%, the roadway surrounding rock deformation can be reduced by more than 60%, and the comprehensive
mining efficiency can be increase by 6.4%, which significantly improved the stability and support efficiency of the
underground roadway.

Key words: large mining height; small coal pillar setting; roadway support