义棠青云煤业2号和5号煤层瓦斯抽采工程设计
发布人:网站管理员 发布时间:2022/7/8 点击次数:34次
  

义棠青云煤业2号和5号煤层瓦斯抽采工程设计
葛鹏
(山西凯嘉能源集团有限公司,山西 介休 032000)
摘要: 义棠青云煤业开采2 号和5 号煤层时瓦斯涌出量较大,需要设立瓦斯抽采系统。根据瓦斯来源情况,设计了
瓦斯抽采方法。对于回采工作面,在运输顺槽施工顺层钻孔进行本煤层瓦斯预抽和边采边抽。对于采空区,在2 号、5 号
煤层回采工作面上隅角进行插管抽采。经过计算,瓦斯抽采时间在120 d时可以实现安全开采。
关键词: 瓦斯抽采;抽采工程;瓦斯涌出量;抽采方法
中图分类号: TD712.6     文献标志码: A     文章编号: 2095-0802-(2022)06-0049-03
Gas Drainage Engineering Design of No.2 and No.5 Coal Seams of Yitang Qingyun Coal Industry
Co., Ltd.
GE Peng
(Shanxi Kaijia Energy Group Co., Ltd., Jiexiu 032000, Shanxi, China)
Abstract: Yitang Qingyun Coal Industry Co., Ltd. had a large amount of gas emission when mining No.2 and No.5 coal seams, so
it was necessary to set up a gas drainage system. According to the gas source, the gas drainage methods were designed. For the
stoping working face, the coal seam gas was pre-pumped and pumped while mining by drilling holes along the transport passage.
For the goaf, intubation was performed in the corner of No.2 and No.5 coal seam mining working face. After calculation, the safe
mining can be realized when the gas extraction time is 120 d.

Key words: gas extraction; extraction engineering; gas gushing amount; extraction method