202211

近采空区掘进巷道围岩支护优化研究
发布人:网站管理员 发布时间:2022/11/17 点击次数:23次
  

近采空区掘进巷道围岩支护优化研究
牛浩
(长治市煤矿技术服务中心,山西 长治 046000)
摘要: 马道沟矿13307 回风巷邻近采空区掘进,发现原有支护锚杆(索)预紧力偏小、支护构件组合不匹配、围岩
强度低以及煤柱小等是导致巷道围岩变形量过大的主要原因。根据13307 回风巷现场情况进行锚杆(索) 支护测试,并
根据测试结果对锚杆(索)预紧力进行优化,提出采用全锚索方式对围岩进行支护,并对支护优化方案进行设计。现场
应用后,巷道围岩支护用的锚杆(索) 受力稳定,未出现失效问题;巷道顶板、巷帮变形量较小,可满足使用需要。
关键词: 巷道掘进;围岩支护;小煤柱;全锚索支护
中图分类号: TD353      文献标志码: A      文章编号: 2095-0802-(2022)11-0104-03
Optimization of Surrounding Rock Support of Roadways near Goaf
NIU Hao
(Changzhi Coal Mine Technology Service Center, Changzhi 046000, Shanxi, China)
Abstract: 13307 air return roadway in Madaogou Mine is driven near the goaf. It is found that the low pretightening force of the
original support bolt (cable), the mismatched support component combination, the small surrounding rock strength and coal pillar
are the main reasons for the excessive deformation of the roadway surrounding rock. According to the on-site situation of 13307
air return roadway, the anchor bolt (cable) support test was carried out, and the pretightening force of the anchor bolt (cable) was
optimized according to the test results. The full anchor cable method was proposed to support the surrounding rock, and the
support optimization scheme was designed. After field application, the bolt (cable) used for roadway surrounding rock support is
stable in force, without failure; the deformation of roadway roof and sides is small, which can meet the needs of use.

 Key words: roadway tunneling; surrounding rock support; small coal pillar; full anchor cable support