大唐蔚县2×660 MW 电厂主厂房布置优化
发布人:网站管理员 发布时间:2016/4/22 点击次数:140次
  

大唐蔚县2×660 MW电厂主厂房布置优化
洪如松
(中国大唐集团科学技术研究院有限公司,北京102206)
摘要: 以大唐蔚县2×660 MW电厂为例,叙述了该电厂的主厂房布置,分析了该电厂整体布置、工艺系统和设备布
置的合理性,提出了主厂房布置优化方案。
关键词: 电厂;主厂房;布置优化
中图分类号: TU976+.9 文献标识码: A 文章编号: 2095-0802-(2016)04-0058-02
On the Optimization Layout of Main Workshop in Datang Yuxian 2伊660 MW Power Plant
HONG Rusong
(Science and Technological Research Institute Co., Ltd., China Datang Group, Beijing 102206, China)
Abstract: Taking Datang Yuxian 2伊660 MW Power Plant as example, this paper described main workshop layout in the plant,
analyzed reasonability of plant overall layout, process system and equipment layout, and proposed layout optimization scheme of
main workshop.

 Key words: power plant; main workshop; layout optimization