火电机组深度调峰能力验证试验探讨
发布人:网站管理员 发布时间:2023/7/20 点击次数:19次
  

火电机组深度调峰能力验证试验探讨
丛星亮1,吕洪坤2,施壮1,吕华兵3,唐昊4
(1.国网安徽省电力有限公司电力科学研究院,安徽 合肥 230601;2.国网浙江省电力有限公司电力科学研究院,浙江 杭州
310014;3.中煤宣城发电有限公司,安徽 宣城 242000;4.合肥工业大学,安徽 合肥 230009)
摘要: 火电机组深度调峰是全面消纳新能源发电和构建新型电力系统的重要组成部分。火电机组深度调峰能力试验
是验证机组是否具备相应调峰能力的重要手段。以630 MW 超临界机组为例,从机组最小技术出力的安全性、CCS
(Coordination Control System,协调控制系统)变负荷和一次调频性能三方面开展验证试验。试验结果表明,机组在30%
额定负荷(Pe)下,锅炉、汽机及其辅机安全稳定运行且环保指标达标;30%Pe ~40%Pe下,CCS 升降负荷速率分别为每
分钟1.04%Pe和每分钟0.53%Pe,AGC (Automatic Generation Control,自动发电控制)和一次调频性能均满足规定的要求。
关键词: 火电机组;深度调峰;最小技术出力;CCS 变负荷;一次调频性能
中图分类号: TM621      文献标志码: A      文章编号: 2095-0802-(2023)06-0123-04
Verification Test of Deep Peak Regulating Capacity of Thermal Power Units
CONG Xingliang1, LYU Hongkun2, SHI Zhuang1, LYU Huabing3, TANG Hao4
(1. Electric Power Research Institute, State Grid Anhui Electric Power Co., Ltd., Hefei 230601, Anhui, China; 2. Electric Power
Research Institute, State Grid Zhejiang Electric Power Co., Ltd., Hangzhou 310014, Zhejiang, China; 3. China Coal Xuancheng
Power Generation Co., Ltd., Xuancheng 242000, Anhui, China; 4. Hefei University of Technology, Hefei 230009, Anhui, China)
Abstract: Deep peak regulation of thermal power units is an important part of comprehensive absorption of new energy power
generation and construction of new power system. The deep peak regulating ability test of thermal power units is an important
means to verify whether the unit has the corresponding peak regulating ability. Taking a 630 MW supercritical unit as an example,
the validation tests were carried out from three aspects: the safety of the minimum technical output of the unit, the variable load of
CCS (Coordination Control System) and the performance of primary frequency modulation. The test results show that under 30%
rated load (Pe), the boiler, steam engine and its auxiliary engines operate safely and stably, and the environmental protection index
reaches the standard; at 30%Pe to 40%Pe, the loading and unloading rates of CCS are 1.04%Pe per minute and 0.53%Pe per minute
respectively. Both AGC (Automatic Generation Control) and primary frequency modulation performance meet the requirements.

Key words: thermal power unit; deep peak regulation; minimum technical output; CCS variable load; primary frequency
modulation performance